Asset Report
Mukran Phase 2 Energos Power
Report summary
Mukran Phase 2 Energos Power, formally known as Lubmin FSRU Dynagas, is an under construction regas terminal at the Mukran port, Rügen Island, Germany. The terminal is expected to start by July 2024. The port was initially planned at the port of Lubmin, and afterwards, the location changed to Mukran port in Germany. The port of Lubmin has several advantages and disadvantages for deploying an FRSU. It is the terminus of the Nord Stream 1 and 2 pipelines, which is close to the existing ...
Table of contents
- Key facts
- Location maps
- Terminal overview
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 4 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Mukran Phase 1 Neptune
Mukran Phase 1 Neptune (Deutsche Ostee LNG import terminal) is a floating regas terminal located at the port of Lubmin, in the Bay of ...
$1,200
Commodity Market Report
Netherlands and Belgium power markets long-term outlook: May 2024
Our May 2024 long-term outlook for the Netherlands and Belgium power markets, with fully integrated supply-demand analysis and prices.
$18,000
Commodity Market Report
Germany power market long-term outlook: May 2024
We present our May 2024 long-term outlook for the German power market, with fully integrated supply-demand analysis and prices.
$15,000