Asset Report

Baise Mining aluminium smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Total design capacity of Baise Mining is 1.3 Mtpa, consisting of 300-ktpa Xinshan, 200-ktpa Suyuan, 300-ktpa Debao, 300-ktpa Tianlin and 200-ktpa Longlin Baise. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Emissions
  • Alumina Source
  • Anodes Source
    • Power Type
    • Power Source
    • Power Supplier
    • Power Contract

Tables and charts

This report includes 2 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Xinshan (Aluminium) aluminium smelter

    XLS 149.50 KB

  • Document

    Baise Mining aluminium smelter

    PDF 1.36 MB

  • Document

    Xinshan (Aluminium) aluminium smelter

    ZIP 1.13 MB

  • Document

    Suyuan

    XLS 151.00 KB

  • Document

    Debao

    XLS 149.50 KB

  • Document

    Tianlin

    XLS 150.50 KB