Asset Report
Chibuluma South copper mine
Report summary
Chibuluma South is the only operating division of Chibuluma Mines which also includes Chibuluma West (closed in 2005 and covered by a separate analysis). Chibuluma South lies approximately 12km to the south of Chibuluma West and around 20km to the south west of Kitwe. The Chifupu extension was completed in 2016. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- CAPEX
-
Operating
- Labour
- Mining
- Processing
- Royalties & Taxes
Tables and charts
This report includes 2 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Kemess South copper mine
A detailed analysis of the Kemess South copper mine.
$2,250
Asset Report
Chibuluma West (Closed) copper mine
A detailed analysis of the Chibuluma West copper mine.
$2,250
Asset Report
Sarcheshmeh copper mine
A detailed analysis of the Sarcheshmeh copper mine.
$2,250