Asset Report
Kipushi zinc smelter project
Report summary
The Kipushi mine operated as a commercial mine up until 1993, at which time it was placed on care and maintenance. Peak production in the 1980s reached 1.5Mt/a of ore containing 143kt zinc. The reopening of the mine has been under consideration since 1996, when American Mineral Fields (AMF) – the fore-runner of Adastra Minerals - reached an agreement with Gécamines to earn up to a 50% interest in Kipushi by funding a feasibility study. In 2000 Zincor expressed interest in becoming a...
Table of contents
- Residue Disposal
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Huili zinc smelter project
A detailed analysis of the Huili zinc smelter project.
$2,250
Asset Report
Cartagena (Escombreras) zinc smelter project
A detailed analysis of the Cartagena (Escombreras) zinc smelter project.
$2,250
Asset Report
Nueva Rosita zinc smelter project
A detailed analysis of the Nueva Rosita zinc smelter project.
$2,250