Asset Report
La Libertad (Orosi) gold mine
Report summary
La Libertad is an open pit and underground operation. Open pit mining is carried out utilising conventional drill, blast and haul mining methods. Underground mining commenced from the Jabali West deposit in 2019 and mining is carried out using sublevel-stoping type methods (Avoca - longitudinal retreat and longitudinal longhole). The processing plant has a capacity of 2.2Mt/a and comprises a carbon in pulp (CIP) circuit. Gold production in 2020 was 71koz.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Tayoltita (Closed) gold mine
A detailed analysis of the Tayoltita (Closed) gold mine.
$2,250
Asset Report
La Colorada gold mine
A detailed analysis of the La Colorada gold mine.
$2,250
Asset Report
Soto Norte (La Bodega) gold mine project
A detailed analysis of the Soto Norte gold mine project.
$2,250