Asset Report
Yellowhead copper mine project
Report summary
The property is located 150km northeast of Kamloops, in the Thompson-Nicola area of British Columbia. In January 2020, an updated technical report was completed. An open pit mining operation is planned, producing copper concentrate (with gold and silver by-products) at an ore processing rate of 33Mt/a over a 25-year mine life. Approval of the project's Environmental Assessment Application and necessary permits required for project development remain outstanding.
Table of contents
- Summary
- Key issues
- Power
- CAPEX
- Development Timeline
- Mining
- Process
- Royalty Streams
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250
Asset Report
El Morro (Closed) copper mine project
A detailed analysis of the El Morro copper mine project.
$2,250