Asset Report

Zhehai (Huize) zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Zhehai (Huize) zinc smelter shared the site with a 25kt/a conventional sinter-blast furnace lead smelter. The flowsheet was complex with many cross-connections. Due to the age and location of the Zhehai (Huize) smelter it was closed in 2011 and replaced by a new 100kt/a zinc - 60kt/a lead smelter situated at Mawu (also near Huize). Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Location / Transport
  • Conc. Receipt / Storage
  • Roaster
  • Acid Plant
  • Leach Plant
  • Purification
  • Tankhouse
  • Casting Plant
  • Residue Disposal
  • Other

Tables and charts

This report includes 2 images and tables including:

  • Detailed map
  • Flowsheet

What's included

This report contains:

  • Document

    Zhehai (Huize) zinc smelter

    PDF 1.29 MB

  • Document

    Zhehai (Huize) zinc smelter

    ZIP 6.61 MB