Asset Report

Arch - Powder River Basin coal mines

Get this report

$2,550

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

29 May 2019

Arch - Powder River Basin coal mines

Report summary

Arch owns two operating mines in the PRB: Black Thunder and Coal Creek. The company's PRB production continues to decline in 2019 as the company maintains production cuts at Black Thunder and Coal Creek Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
    • Black Thunder
    • Coal Creek
    • Black Thunder
    • Coal Creek
    • Black Thunder
    • Coal Creek

Tables and charts

This report includes 14 images and tables including:

  • Detailed map - Central Powder River Basin
  • Detailed map - Southern Powder River Basin
  • Marketable reserves (at 01/01/2020)
  • Production
  • Production
  • Mine summary 2019
  • Cash costs 2019 (US$/short ton)
  • Company average cash costs and margin (US$/st)
  • Company average cash costs and margin (US$/st)
  • Capital costs (US$ million)
  • Coal Quality

What's included

This report contains:

  • Document

    Arch-United States (PRB)-BASE.xls

    XLS 541.00 KB

  • Document

    Arch - Powder River Basin coal mines

    ZIP 1.53 MB

  • Document

    Arch - Powder River Basin coal mines

    ZIP 1.53 MB

Trusted by leading organisations