Asset Report
Coal asset report - Ashton (Underground) coal mine - May 2022
Report summary
Ashton (Underground) is located in the Hunter Valley of New South Wales, 15 kilometres north-west of Singleton. Ashton (Underground) is located within mining lease ML1533. There is also a surface mine at Ashton, which is covered in a separate asset report. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
Tables and charts
This report includes 14 images and tables including:
- Detailed map
- Participation
- Coal seams
- Marketable reserves
- Production
- Production
- Operations
- Infrastructure
- Cash costs
- Cash costs
- Capital costs
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
31 May 2022
Coal asset report - Ashton coal mine - May 2022
Asset Report
Coal asset report - Ashton coal mine - May 2022
A detailed analysis of the Ashton coal mine.
$2,55031 May 2022
Coal asset report - Dartbrook (Underground) coal mine - May 2022
Asset Report
Coal asset report - Dartbrook (Underground) coal mine - May 2022
A detailed analysis of the Dartbrook (Underground) coal mine.
$2,55021 July 2022
Coal asset report - Ulan (Underground) coal mine - May 2022
Asset Report
Coal asset report - Ulan (Underground) coal mine - May 2022
A detailed analysis of the Ulan (Underground) coal mine.
$2,550