Asset Report
Coal asset report - Belvedere coal mine - May 2022
Report summary
Belvedere is a hard coking coal project in the southern Bowen Basin, Queensland, located 7 kilometres north east of Moura. Belvedere is at an early stage of planning: the pre-feasibility study has been completed and an environmental impact statement (EIS) is being prepared. Three main mining lease applications have been submitted for areas within the 325 square kilometre exploration area EPC 783: MLA 80148 (Belvedere 1), MLA 80149 (Belvedere 2), and MLA 80150 (Belvedere 3).
Table of contents
- Summary
- Key issues
Tables and charts
This report includes 13 images and tables including:
- Detailed map
- Participation
- Coal seams
- Marketable reserves
- Production
- Production
- Operations
- Infrastructure
- Cash costs
- Cash costs
- Capital costs
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
31 May 2022
Coal asset report - Yarrabee coal mine - May 2022
Asset Report
Coal asset report - Yarrabee coal mine - May 2022
A detailed analysis of the Yarrabee coal mine.
$2,55022 July 2022
Coal asset report - Wambo North coal mine - May 2022
Asset Report
Coal asset report - Wambo North coal mine - May 2022
A detailed analysis of the Wambo North coal mine.
$2,55026 May 2022
Coal asset report - Rolleston coal mine - May 2022
Asset Report
Coal asset report - Rolleston coal mine - May 2022
A detailed analysis of the Rolleston coal mine.
$2,550