Asset Report
Coal asset report - Yarrabee coal mine - May 2022
Report summary
Yarrabee is a surface mine located 40 kilometres northeast of Blackwater in Queensland’s Bowen Basin, covering the mining leases ML 80172 and ML 80195. The mine produces low vol semi-anthracite PCI for the export market. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Key issues
- Participation
- Coal seams
- Production
- Cash costs
- Capital costs
Tables and charts
This report includes 14 images and tables including:
- Detailed map
- Marketable reserves
- Production
- Operations
- Cash costs
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
30 May 2023
Coal asset report - Narrabri coal mine - May 2023
Asset Report
Coal asset report - Narrabri coal mine - May 2023
A detailed analysis of the Narrabri coal mine.
$2,55026 May 2023
Coal asset report - Stratford - May 2023
Asset Report
Coal asset report - Stratford - May 2023
Detailed asset level data for this mine or project.
$2,55001 June 2022
Coal asset report - Belvedere coal mine - May 2022
Asset Report
Coal asset report - Belvedere coal mine - May 2022
A detailed analysis of the Belvedere coal mine.
$2,550