There are over 10 proposed LNG terminals in Vietnam. However, most of these are integrated with LNG to power, targeting an anticipated power shortage. Will the threat of blackouts lead Vietnam to embrace LNG or will it continue to rely on coal? Key highlights • Vung Tau LNG terminal emerges as a dark horse in the race for regas terminals in Vietnam with commercial operation expected in 2021 • Bac Lieu LNG, the first fully private LNG-to-power project, signed a PPA with EVN in 2021 • Coal-fired power may start to lose favour towards the 2030s, fuelling LNG demand until 2040 before it plateaus as power demand slows and renewables continue to take a bigger share of the fuel mix. We have added a comprehensive list of proposed LNG regas projects in this update, along with our latest view on demand up to 2050.
Table of contents
- Market background
- Hai Linh LNG terminal completes construction, Bac Lieu blazes ahead with LNG supply RFP and PPA discussion underway
- North Vietnam sees two proposed LNG-to-power project
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Commodity Market Report
Southern Cone gas and power short-term outlook: March 2024
Monthly report analysing the gas and power fundamentals and prices in Argentina, Brazil, Chile and Bolivia until December 2025.
$2,000
Insight
2020 Wood Mackenzie Japan Gas Series - presentations and recordings
Presentations and recordings from the 2020 Japan Gas Series, held virtually on 23-25 June 2020 are now available for download.
$1,050
Insight
Russian Federation upstream: seven signposts for the future
The outlook for Russia’s upstream is uncertain. What are the signposts to look for as Russia tries to maximise value from oil and gas?
$1,350