Report summary

Total cash plus sustaining costs (TCPS) decreased from US$937/oz in 2014 to an estimated US$821/oz in 2015. The bulk of the year-on-year cost savings were attributed to a significantly stronger US dollar relative to the currencies of major gold producing countries. With the gold price falling for third straight year, from US$1,410/oz in 2013 to US$1,160/oz in 2015, the gold mining industry continued to implement a number of cost-cutting measures.

What's included

This report contains

  • Document

    Global gold mine supply summary

    PDF 22.51 MB

Table of contents

Tables and charts

This report includes 62 images and tables including:

Images

  • Project production capacity
  • Gold mine projects by location
  • Margins: Image 1
  • Total cash plus sustaining capital profile - price relationship (US$)
  • Global gold production (2016)
  • Top 10 Chinese gold producers
  • Global mine supply outlook
  • Costed gold production outlook
  • Ore production by process type
  • 2016 to 2017F waterfall chart
  • Evolution of gold mining C1 costs
  • Schematic Conical Open Pit definitions
  • General Layout of an Underground mine – Cross Section
  • Evolution of price, reserve grade and head grades, primary gold mines
  • Gold mine & project reserves December 2015
  • Top 10 mines - ranked on contained gold in reserves December 2015
  • Top 10 projects - ranked on contained gold in reserves December 2015
  • Production: Image 1
  • Costs: Image 2
  • Producer currency index
  • Diesel price sensitivity for gold miners
  • Copper by-product and cost sensitivity to global TCPS
  • Silver by-product and cost sensitivity to global TCPS
  • Labour costs and proportion of mine site costs and productivity
  • Processing cost curves weighted by tonnage treated and gold production
  • Costs: Image 12
  • Mill production and processing cost trends by ore type
  • Initial capital cost vs. annual gold production - all projects (US$)
  • Capital intensity of projects commissioned 2000-2016 (2016 US$)
  • Historic & current capital intensity in 2016 US$ terms
  • Project incentive price – Gold price required to generate positive NPV @ 8%, 12% and 15% discount rates (US$) - Primary gold mines
  • The Mining Cycle
  • Reserves and resources: Image 2
  • Global distribution of contained gold in reserves-2015
  • Reserves and resources: Image 4
  • Costs: Image 9
  • Underground mining cost and grade relationship for difference methods
  • Costs: Image 14
  • Evolution of gold mining TCPS costs
  • Evolution of gold mining C2 costs
  • Evolution of gold mining C3 costs
  • Appendix: Image 4
  • Cut-and-Fill
  • Shrinkage Stoping
  • Shrinkage Room-and-Pillar Mining (Thick and competent orebody)
  • Block Caving
  • Sub-Level Caving
  • Appendix: Image 10
  • A Simple One-Concentrate Flotation Circuit
  • Heap Leaching Circuit

Tables

  • Primary projects only (excluding Co-/By-product projects) (US$)
  • Co-/By-product projects only (US$)
  • Production: Table 1
  • Global gold mine reserves replacement - primary mines (gold price in US$)
  • Production: Table 2
  • KPIs: All mines & projects (US$)
  • Underground mining method classification
  • Ore type and treatment types
  • Production and costs for projects (all projects and base case) which could be developed between 2017 and 2023 (US$)
  • Projects: Table 4
  • Proportion of project capacity generating a positive NPV at 12% discount rate
  • Metal Price Input Assumptions (US$)

You may be interested in

Country report

Global steel cost summary

    
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898