Asset report

Abadi - LNG

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Masela PSC contains the giant Abadi gas field, located in the Timor Sea. The field was discovered by INPEX in 2000. Appraisal drilling in 2007-2008 and 2013-2014 has confirmed total recoverable reserves of around 21 tcf of gas.In May 2008, a Plan of Development (PoD) for Abadi was submitted, consisting of two development options: piping gas to a greenfield onshore LNG plant, or constructing an offshore floating LNG facility. The floating LNG (FLNG) project was the preferred option and ...

What's included

This report contains

  • Document

    Abadi - LNG

    PDF 459.43 KB

Table of contents

  • Key facts
    • Summary
      • Commercial and regulatory risks
      • Indonesia has several regulations which could impact the project:
  • Commercial structure
  • Timeline
  • LNG marketing strategy
  • Shipping strategy
    • Summary
    • Potential upstream development plan
  • Liquefaction plant overview
  • Costs
  • Fiscal and regulatory
  • Economic analysis

Tables and charts

This report includes 6 images and tables including:

Images

  • Commercial structure: Image 1
  • Index Map
  • Detail Map

Tables

  • Key facts: Table 1
  • Timeline: Table 1
  • Upstream overview: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898