Algeria LNG - Commercial Overview (Arzew - Decommissioned)
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Commercial structure
- Timeline
- LNG output
- LNG contracts
- Shipping
Tables and charts
This report includes 4 images and tables including:
- Key facts: Table 1
- Timeline: Table 1
- LNG output: Image 1
- LNG contracts: Table 1
What's included
This report contains:
Other reports you may be interested in
12 November 2019
Algeria LNG - Commercial Overview (Skikda)
Algeria LNG - Commercial Overview (Skikda)
In 1972 the first of the three trains at the GL1K plant at Skikda came onstream. The final trains came onstream in 1981.
$2,25012 November 2019
Algeria LNG - Commercial Overview (Arzew GL3-Z)
Algeria LNG - Commercial Overview (Arzew GL3-Z)
In 2008, Algeria LNG awarded an EPC contract for a new 4.7 mmtpa train at Arzew, called GL3Z.
$2,25026 November 2019
Oman LNG - Oman LNG - commercial overview
Oman LNG - Oman LNG - commercial overview
The foundation development at Oman LNG consisted of trains 1 & 2 each with 3.6 mmtpa capacity.
$2,250