Asset report

Bontang LNG - LNG Plant

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Bontang LNG in Indonesia is a 8 train LNG development operated by PT Badak Natural Gas Liquefaction Co which compromises PERTAMINA VICO Japan Indonesia LNG and Total. The LNG plant analysis outlines the key project metrics development and cost estimates of the plant gas feedstock fiscal structure and economic assumptions used to generate the project cashflow. Please see the Bontang LNG commercial overview for the key issues facing the project contracts details plant and field location maps and an FOB breakeven analysis.

What's included

This report contains

  • Document

    01 bontang data.xls

    XLS 1.31 MB

  • Document

    02 bontang lng plant cash fl.xls

    XLS 177.50 KB

  • Document

    LNG Plant

    PDF 286.02 KB

  • Document

    LNG Plant

    ZIP 646.05 KB

Table of contents

  • Key facts
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 3 images and tables including:

Images

  • Gas feedstocks: Image 1

Tables

  • Key facts: Table 1
  • Economic analysis: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898