Brunsbuettel FSRU
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
 - Location maps
 - 
        
            Terminal overview
        
        
- Regas capacity targeted to ramp up in 2024
 
 - Utilisation
 - Operational basis
 - Offtake
 - Tariffs
 - 
        
            Future expansions
        
        
- A parallel onshore project at Brunsbuettel port: German LNG terminal
 
 
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
 - Key facts: Table 2
 - Key facts: Table 3
 - Map
 
What's included
This report contains:
Other reports you may be interested in
Mukran Phase 2 Energos Power
Mukran Phase 2 Energos Power, formally known as Lubmin FSRU Dynagas, is an under construction regas terminal at the Mukran port, ...
$1,450Lithuania upstream summary
Minor oil producer with output at post-independence low - Oil production is currently less than 1,000 b/d, having fallen steadily from ...
$4,080Stade FSRU Energos Force
Stade FSRU is a floating import terminal located directly on the Elbe River, in the Lower Saxony region, Northwest Germany. The ...
$1,450