Asset Report

Darwin LNG - Darwin LNG plant

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Darwin LNG project in Northern Territory (Australia) is a 1-train LNG development operated by ConocoPhillips. The LNG plant analysis outlines the key project metrics, development and cost estimates of the plant, gas feedstock, fiscal structure and economic assumptions used to generate the project cashflow. Please see the Darwin LNG commercial overview for they key issues facing the project, contracts details, plant and field location maps and an FOB breakeven analysis.

What's included

This report contains

  • Document

    01 darwin plant data.xls

    XLS 1.12 MB

  • Document

    02 darwin lng cash flow.xls

    XLS 154.50 KB

  • Document

    Darwin LNG plant

    PDF 196.85 KB

  • Document

    Darwin LNG plant

    ZIP 528.71 KB

Table of contents

    • Links to related reports
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
    • Discount rate and date
    • Inflation rate
    • Exchange rate
    • Oil price
  • Economic analysis

Tables and charts

This report includes 4 images and tables including:

Tables

  • Key facts: Table 1
  • Costs: Table 1
  • Economic analysis: Table 1

Images

  • Gas feedstocks: Image 1

You may be interested in

Asset Report

Bayu-Undan (LNG)

Asset Report

Barossa Area

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898