Asset report

ELNG - Train 2 Plant

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The ELNG Train 2 project in Egypt is a 1 train LNG development operated by ELNG Operating Company. The LNG plant analysis outlines the key project metrics development and cost estimates of the plant gas feedstock fiscal structure and economic assumptions used to generate the project cashflow. Please see the ELNG Train 2 commercial overview for the key issues facing the project contracts details plant and field location maps and an FOB breakeven analysis.

What's included

This report contains

  • Document

    2017 01- elng 1 data.xls

    XLS 524.50 KB

  • Document

    2017 01- elng 1 plant cf.xls

    XLS 176.50 KB

  • Document

    2017 01- elng 2 data.xls

    XLS 524.50 KB

  • Document

    2017 01- elng 2 plant cf.xls

    XLS 176.50 KB

  • Document

    Train 2 Plant

    PDF 282.08 KB

  • Document

    Train 2 Plant

    ZIP 684.60 KB

Table of contents

  • Key facts
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 4 images and tables including:

Images

  • Gas feedstocks: Image 1

Tables

  • Key facts: Table 1
  • Costs: Table 1
  • Economic analysis: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898