Inform
First LNG arrives in Bangladesh
This report is currently unavailable
Report summary
Excelerate Energy's Floating Storage and Regasification Unit (FSRU) Excellence arrived at Moheshkhali Port on April 23rd. The brings with it a commissioning cargo from Qatar. The project was co-developed by Petrobangla, Excelerate Energy and the IFC. Bangladesh suffers from two crippling energy shortages: electricity and gas. The introduction of LNG into the fuel mix is a critical step in overcoming these challenges.
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
SK320 (LNG)
The SK320 PSC contains a number of gas fields offshore Sarawak that will be developed to supply the MLNG Train 9 project. The Pegaga gas...
$3,100
Insight
China economic focus March 2024: how to achieve the 5% growth target?
Equipment and auto renewal and exports could pose upside surprises for the Chinese economy in 2024.
$950
Asset Report
Rajasthan (ONGC only)
Rajasthan has not historically been a key area of focus for ONGC. The company has made several gas discoveries in the basin, but none …
$3,100