Inform

First LNG arrives in Bangladesh

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Excelerate Energy's Floating Storage and Regasification Unit (FSRU) Excellence arrived at Moheshkhali Port on April 23rd. The brings with it a commissioning cargo from Qatar. The project was co-developed by Petrobangla, Excelerate Energy and the IFC. Bangladesh suffers from two crippling energy shortages: electricity and gas. The introduction of LNG into the fuel mix is a critical step in overcoming these challenges.

What's included

This report contains

  • Document

    First LNG arrives in Bangladesh

    PDF 988.13 KB

Table of contents

  • No table of contents specified

Tables and charts

No table or charts specified

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898