Asset report

MLNG Dua - MLNG Dua Plant

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The MLNG Dua project in Malaysia is a 3 train LNG development operated by a joint venture between PETRONAS Mitsubishi Corporation and Sarawak State Government. The LNG Plant analysis outlines the key project metrics development and cost estimates of the plant gas feedstock fiscal structure and economic assumptions used to generate the project cashflow. Please see the MLNG Dua commercial overview for the key issues facing the project contracts details plant and field location maps and an FOB breakeven analysis.

What's included

This report contains

  • Document

    00 mlng dua - data.xls

    XLS 1.21 MB

  • Document

    01 mlng dua plant cash flow.xls

    XLS 180.50 KB

  • Document

    MLNG Dua Plant

    PDF 288.39 KB

  • Document

    MLNG Dua Plant

    ZIP 637.12 KB

Table of contents

  • Key facts
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 4 images and tables including:

Images

  • Gas feedstocks: Image 1

Tables

  • Key facts: Table 1
  • Economic analysis: Table 1
  • Costs: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898