Asset report

MLNG - MLNG Satu Plant

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The MLNG project in Malaysia is a 3-train LNG development operated by a joint venture between PETRONAS, Mitsubishi Corporation and Sarawak State Government. The LNG plant analysis outlines the key project metrics, development and cost estimates of the plant, gas feedstock, fiscal structure and economic assumptions used to generate the project cashflow. Please see the MLNG commercial overview for the key issues facing the project, contracts details, plant and field location maps and an FOB breakeven analysis.

What's included

This report contains

  • Document

    00 mlng satu - data.xls

    XLS 1.25 MB

  • Document

    01 mlng satu plant cash flow.xls

    XLS 183.00 KB

  • Document

    MLNG Satu Plant

    PDF 283.02 KB

  • Document

    MLNG Satu Plant

    ZIP 644.95 KB

Table of contents

    • Links to related report
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Oil price
    • LNG Price - Contracted
    • LNG Price
    • Global Economic Model
  • Economic analysis

Tables and charts

This report includes 4 images and tables including:

Images

  • Gas feedstocks: Image 1

Tables

  • Key facts: Table 1
  • Costs: Table 1
  • Economic analysis: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898