Asset report

MLNG Tiga - MLNG Tiga Pipelines

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The offshore pipelines associated with the MLNG Tiga development consist of:A 152 km 30 inch pipeline from facilities on the M1 field to the riser platform E11R C on the E11 fieldA 109 km 24 inch pipeline from the Helang field to E11 via B11A new riser platform E11R C on the E11 fieldTwo 127 km 32 inch pipelines from E11 to shoreOnshore slugcatcherIn May 2002 the pipeline installation contract was awarded to Nippon Steel. The project was completed in January 2004. This infrastructure ...

What's included

This report contains

  • Document

    MLNG Tiga Pipelines

    PDF 257.26 KB

Table of contents

  • Key facts
  • Development
  • Costs
  • Gas sales
  • Economic assumptions
  • Fiscal and regulatory
  • Economic analysis

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1
  • Economic analysis: Table 1

You may be interested in?

Asset report

Oregon LNG

Asset report

Cyprus LNG

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898