Asset report

MLNG Train 9 - MLNG Train 9 Plant

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The MLNG Train 9 in Malaysia is a 1 train LNG development operated by PETRONAS. The LNG plant analysis outlines the key project metrics development and cost estimates of the plant gas feedstock fiscal structure and economic assumptions used to generate the project cashflow. Please see the MLNG Train 9 commercial overview for the key issues facing the project contracts details plant and field location maps and an FOB breakeven analysis.

What's included

This report contains

  • Document

    00 mlng train 9 data.xls

    XLS 1003.00 KB

  • Document

    01 mlng t9 plant cash flow.xls

    XLS 177.50 KB

  • Document

    MLNG Train 9 Plant

    PDF 277.71 KB

  • Document

    MLNG Train 9 Plant

    ZIP 570.87 KB

Table of contents

  • Key facts
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 4 images and tables including:

Images

  • Gas feedstocks: Image 1

Tables

  • Key facts: Table 1
  • Costs: Table 1
  • Economic analysis: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898