Asset report

Neptune - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The GDF Suez Neptune LNG deepwater port facility 16 km (10 miles) offshore Gloucester Massachusetts consists of two subsurface buoys connected to a subsea pipeline via a flexible riser. The system allows LNG volumes to be offloaded from a ship in a regasified state rather than in a liquid form as is the case in conventional ship to regas terminal transfer. The technology uses specially designed ships with on board regasification facilities.The United States Coast Guard (USCG) and ...

What's included

This report contains

  • Document

    Neptune - LNG regas terminal.xls

    XLS 196.50 KB

  • Document

    Neptune - LNG regas terminal

    PDF 342.75 KB

  • Document

    Neptune - LNG regas terminal

    ZIP 398.19 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

Images

  • Map
  • Approximate Monthly Import Data by Country

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898