Asset Report

Neptune - LNG regas terminal

Get this report

$950

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

01 May 2015

Neptune - LNG regas terminal

Report summary

The GDF Suez Neptune LNG deepwater port facility, 16 km (10 miles) offshore Gloucester, Massachusetts, consists of two subsurface buoys connected to a subsea pipeline via a flexible riser. The system allows LNG volumes to be offloaded from a ship in a regasified state, rather than in a liquid form as is the case in conventional ship to regas terminal transfer. The technology uses specially designed ships with on-board regasification facilities.The United States Coast Guard (USCG) and ...

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3
  • Map
  • Approximate Monthly Import Data by Country

What's included

This report contains:

  • Document

    Neptune - LNG regas terminal.xls

    XLS 196.50 KB

  • Document

    Neptune - LNG regas terminal

    PDF 342.75 KB

  • Document

    Neptune - LNG regas terminal

    ZIP 398.19 KB

Other reports you may be interested in

Browse reports by Industry Sector