Asset report

Nigeria LNG (NLNG) - NLNG Six Plant

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

NLNG Six is a 1 train LNG development operated by Nigeria LNG. It started production in late 2007 and is the most recent addition to the 22 mmtpa complex. This analysis outlines key project metrics development and cost estimates gas feedstock fiscal structure and economic assumptions behind the project cashflow. Please see the NLNG Six commercial overview for the key issues facing the project contracts details plant and field location maps and an FOB breakeven analysis.

What's included

This report contains

  • Document

    nlng base cash flow.xls

    XLS 166.00 KB

  • Document

    nlng expansion cash flow.xls

    XLS 165.50 KB

  • Document

    nlng plus cash flow.xls

    XLS 149.50 KB

  • Document

    nlng six cash flow.xls

    XLS 150.00 KB

  • Document

    NLNG Six Plant

    PDF 265.89 KB

  • Document

    NLNG Six Plant

    ZIP 567.07 KB

Table of contents

  • Key facts
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1
  • Costs: Table 1
  • Economic analysis: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898