Asset report

Nigeria LNG (NLNG) - NLNG Six Plant

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

NLNG Six is a 1-train LNG development operated by Nigeria LNG. It started production in late 2007 and is the most recent addition to the 22 mmtpa complex. This analysis outlines key project metrics, development and cost estimates, gas feedstock, fiscal structure and economic assumptions behind the project cashflow. Please see the NLNG Six commercial overview for the key issues facing the project, contracts details, plant and field location maps and an FOB breakeven analysis.

What's included

This report contains

Table of contents

  • Key facts
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
    • LNG flow assumptions
  • Economic analysis

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1
  • Costs: Table 1
  • Economic analysis: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898