Insight

North America LNG projects quarterly update: Q2 2016

From

$1,050.00

Get this report

From

$1,050.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Project activity: Low commodity prices caused several projects to be suspended or cancelled (Douglas Channel North Shore and St. John LNG) FERC Queue: Texas LNG filed its formal application. FERC rejected the application by Jordan Cove and Pacific Connector pipeline. FID tracker: Shell deferred FID at LNG Canada until end 2016; Elba Island moving closer to FID with award of EPC contract to IHI E&C; regulatory delay at Pacific NorthWest Marketing: Preliminary tolling agreements announced at Jordan Cove (3.0 mmtpa) and SPA at Calacasieu Pass (1.0 mmtpa)

What's included

This report contains

  • Document

    Q2 16 North America LNG FID Tracker Spreadsheet.xls

    XLS 176.50 KB

  • Document

    Map.pdf

    PDF 121.22 KB

  • Document

    North America LNG projects quarterly update: Q2 2016

    PDF 533.59 KB

  • Document

    North America LNG projects quarterly update: Q2 2016

    ZIP 699.38 KB

Table of contents

Tables and charts

This report includes 7 images and tables including:

Images

  • Project activity
  • North America LNG projects quarterly update: Q2 2016: Image 2
  • Status of FERC applications
  • US LNG terminal locations
  • FERC Notice of Schedule
  • Timeline from FID to delivery (first LNG) by individual LNG train
  • Canada LNG export applications

You may be interested in?

    
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898