Asset Report
Qatargas 1 - LNG Plant
Report summary
The Qatargas 1 project in Qatar is a 3-train LNG development operated by Qatargas on behalf of its shareholders - Qatar Petroleum, ExxonMobil, Total, Marubeni and Mitsui. The LNG plant analysis outlines the key project metrics, development and cost estimates of the plant, gas feedstock, fiscal structure and economic assumptions used to generate the project cashflow. Please see the Qatargas 1 commercial overview for the key issues facing the project, contracts details, plant and field location maps and an FOB breakeven analysis.
Table of contents
- Key facts
-
Development
- Links to related report
- Gas feedstocks
- Costs
- Fiscal and regulatory
-
Economic assumptions
- Capacity utilisation & losses
- Economic analysis
Tables and charts
This report includes 3 images and tables including:
- Key facts: Table 1
- Costs: Table 1
- Economic analysis: Table 1
What's included
This report contains:
Other reports you may be interested in
Asset Report
Qatargas 1 - Commercial Overview
Qatargas-1 is Qatar's first LNG export project. It has a capacity of 9.7 mmtpa.
$2,250
Asset Report
Map Ta Phut 1 - LNG regas terminal
The Map Ta Phut terminal began operations in 2011. Currently it has 11.5-mmtpa of send-out capacity and 640,000m³ of LNG storage.
$1,200
Asset Report
Douglas Channel LNG - LNG Plant
Douglas Channel LNG is a proposed small-scale floating LNG (FLNG) export project in Kitimat, British Columbia, Canada. The ...
$2,250