Asset report

Sabine Pass Export - Phase 2 LNG Plant

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Sabine Pass Export Phase 2 in Louisiana is a 2 train LNG development operated by Cheniere. The LNG plant analysis outlines the key project metrics development and cost estimates of the plant gas feedstock fiscal structure and economic assumptions used to generate the project cashflow. Please see the Sabine Pass Export Phase 2 commercial overview for they key issues facing the project contracts details plant and field location maps and an FOB breakeven analysis.

What's included

This report contains

  • Document

    Phase 2 LNG Plant

    PDF 279.97 KB

Table of contents

  • Key facts
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1
  • Economic analysis: Table 1
  • Costs: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898