Asset report

Sabine Pass Export - Train 5 LNG Plant

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Sabine Pass LNG agreed to a $3 billion engineering procurement and construction contract in May 2015. The contract specified one train of 4.5 mmtpa nominal capacity which was a change from previous EPC contracts with Bechtel which covered two phases of two trains each. The train like its predecessors will utilize ConocoPhillips' Optimized Cascade technology. It will be integrated with the regas terminal's five LNG storage tanks two shiploading berths utilities and pipeline ...

What's included

This report contains

  • Document

    Train 5 LNG Plant

    PDF 276.96 KB

Table of contents

  • Key facts
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1
  • Costs: Table 1
  • Economic analysis: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898