Asset Report

Sabine Pass Export - Train 5 LNG Plant

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Sabine Pass LNG agreed to a $3 billion engineering, procurement and construction contract in May 2015. The contract specified one train of 4.5 mmtpa nominal capacity, which was a change from previous EPC contracts with Bechtel, which covered two phases of two trains each. The train, like its predecessors, will utilize ConocoPhillips' Optimized Cascade technology. It will be integrated with the regas terminal's five LNG storage tanks, two shiploading berths, utilities and pipeline ...

What's included

This report contains

  • Document

    Train 5 LNG Plant

    PDF 276.96 KB

Table of contents

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1
  • Costs: Table 1
  • Economic analysis: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800