Asset Report

Sengkang LNG - LNG Plant

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Sengkang project in Indonesia is a 1-train LNG development that will be operated by Energy World Corporation. The LNG plant analysis outlines the key project metrics, development and cost estimates of the plant, gas feedstock, fiscal structure and economic assumptions used to generate the project cashflow. Please see the Sengkang LNG commercial overview for the key issues facing the project, contracts details, plant and field location maps and an FOB breakeven analysis.

What's included

This report contains

  • Document

    01 sengkang lng data.xls

    XLS 527.00 KB

  • Document

    02 sengkang plant cash flow.xls

    XLS 170.00 KB

  • Document

    LNG Plant

    PDF 274.26 KB

  • Document

    LNG Plant

    ZIP 442.15 KB

Table of contents

    • Links to related report
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • LNG Price
    • Feedgas Price
    • Global Economic Model (GEM) Filename
  • Economic analysis

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1
  • Economic analysis: Table 1

Images

  • Gas feedstocks: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800