Asset report

Tangguh LNG - Phase 2 Plant

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Tangguh Phase 2 project in West Papua Indonesia is a 1 train LNG development operated by BP. The Tangguh Phase 2 commercial overview outlines the project development and commercial structure. It explores the key issues facing the project details the contracts and contains plant and field location maps and an FOB breakeven analysis. Please see the Tangguh report for details of upstream assets that feed into the project.

What's included

This report contains

  • Document

    tangguh 1 plant cash flow.xls

    XLS 174.00 KB

  • Document

    tangguh 1 data.xls

    XLS 1.13 MB

  • Document

    tangguh 2 plant cash flow.xls

    XLS 171.50 KB

  • Document

    tangguh 2 data.xls

    XLS 1.08 MB

  • Document

    Phase 2 Plant

    PDF 274.11 KB

  • Document

    Phase 2 Plant

    ZIP 935.67 KB

Table of contents

  • Key facts
  • Development
  • Gas feedstocks
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 3 images and tables including:

Images

  • Gas feedstocks: Image 1

Tables

  • Key facts: Table 1
  • Economic analysis: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898