Asset Report

UK proposed LNG regas projects

Get this report

$950

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

03 December 2015

UK proposed LNG regas projects

Report summary

There are three operational LNG terminals in the UK (after Teesside GasPort was decommissioned in 2015) with around 5,000 mmcfd (~52 bcm) of regas capacity. There are a number of proposals to develop new terminals, but with the exception of Port Meridian, none have made progress in recent years. Although LNG imports are expected to rise as domestic production declines, new capacity could come from expanding existing terminals rather than developing new facilities.

Table of contents

  • Location maps
  • Proposed projects - overview
  • Location detail

Tables and charts

This report includes 6 images and tables including:

  • Map
  • Location detail: Table 1
  • Location detail: Table 2
  • Location detail: Table 3
  • Location detail: Table 4
  • Location detail: Table 5

What's included

This report contains:

  • Document

    UK proposed LNG regas projects

    PDF 610.95 KB

Other reports you may be interested in

Browse reports by Industry Sector