Asset Report

Abra Project lead mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Abra project will comprise of an underground mine and a 1.3Mt/a mill throughput to produce a high grade lead-silver concentrate. The mine is to produce in average around 93kt lead and 553koz of silver in lead concentrate per year during steady state production. An updated mine plan was published in 2022 and supersedes the previous 2019 Feasibility Study. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX
  • Royalties and taxes

Tables and charts

This report includes 1 images and tables including:

  • Detailed Map

What's included

This report contains:

  • Document

    Abra Project lead mine

    XLS 364.50 KB

  • Document

    Abra Project lead mine

    PDF 1.09 MB

  • Document

    Abra Project lead mine

    ZIP 759.70 KB

  • Document

    Abra Znflex.xlsm

    XLSM 2.01 MB