Asset report

Aquarius gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Aquarius project is planned as an open pit operation utilising conventional truck and shovel mining methods. St.Andrew Goldfields' original plan was to truck ore to the Stock Gold mill. With the sale of the Stock mill, and subsequent acquisition of St Andrew Goldfields by Kirkland Lake Gold, the accompanying analysis assumes toll milling of ore at a company owned or third party mill within the Timmins area.Development will require completion of a Feasibility Study, revised environmental studies, final permitting and around a two year construction period. For illustrative purposes only, the accompanying analysis assumes first production in 2022, but the project status is tentative.

What's included

This report contains

  • Document

    Aquarius gold mine project

    XLS 122.00 KB

  • Document

    Aquarius gold mine project

    PDF 464.96 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898