Asset report

Asanko - Obotan gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Asanko project was derived from the combination of two standalone (Obotan & Esaase) projects. The Obotan deposit will be developed as Phase 1 while the Esaase deposit will be developed as Phase 2. Both deposits will be mined by open pit methods. Ore from Esaase will be transported 30km by overland conveyor to a carbon in leach plant at Obotan. Mine life is estimated at 12.5 years with average annual gold production estimated at 190koz in the first two years (Obotan) and 411koz from 2018 onwards. Commercial production (Phase 1) was declared in April 2016.

What's included

This report contains

  • Document

    Obotan Project gold mine

    XLS 124.50 KB

  • Document

    Asanko gold mine

    PDF 459.23 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898