Asset report

Wahgnion gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Mining at the Wahgnion project will be open pit utilising conventional drill, blast and haul mining techniques. The process plant will comprise a conventional carbon-in-leach (CIL) circuit with throughput ranging from 2.2Mt/a to 2.5Mt/a.

What's included

This report contains

  • Document

    Wahgnion gold mine project

    XLS 120.00 KB

  • Document

    Wahgnion gold mine project

    PDF 553.54 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Kimbo bauxite mine

Asset report

Kindia bauxite mine

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898