Asset report

Banfora gold project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Banfora Gold Project is fully permitted with EIA approval with a granted mining lease. The accompanying analysis assumes the start up of a 2Mt/a standalone heap leach operation followed by the staggered development of the incremental 1Mt/a Carbon In Leach (CIL) processing plant.Initial capital expenditure was estimated at US$85 million for the heap leach operation and an additional US$45 for the conventional CIL plant. The accompanying analysis assumes the latter is financed through cash flows generated from the early years of the heap leach operation.

What's included

This report contains

  • Document

    Banfora gold project

    XLS 120.00 KB

  • Document

    Banfora gold project

    PDF 553.85 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Costs
  • Operations
  • Infrastructure
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898