Asset report

Bissa-Zandkom gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Bissa Zandkom is Nordgold`s largest and lowest cost asset. The 2015 production of 250koz accounted for just over a quarter of thecompany'soverall production. Mining is by conventional open pit mining methods with the ore treated in a 3.5Mt/a plant based on a carbon in leach (CIL) circuit with an ADR process plant.

What's included

This report contains

  • Document

    Bissa-Zandkom Project gold mine

    XLS 124.00 KB

  • Document

    Bissa-Zandkom gold mine

    PDF 621.16 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898