Asset Report

Black Volta gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Black Volta project, formerly the Wa project, property comprises 3 tenement blocks (including the Wa-Lawra blocks to the west and the Josephine, Julie-Collette licenses that make up the Wa East block). A staged mining approach from a series of open pits is planned, with ore production from the Kunche, Bepkong and Aduane deposits in the Wa Lawra block, and the Julie and Collette deposits in the Wa East block. Ore from the Wa East block will be trucked 85km to a carbon in leach (CIL) plant at Kunche for processing.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Power
  • Rail
  • CAPEX
  • Royalties & Taxes

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Wa gold mine project

    XLS 115.50 KB

  • Document

    Black Volta gold mine project

    PDF 1.28 MB

  • Document

    Wa gold mine project

    ZIP 1.09 MB