Asset report

Blyvooruitzicht (inlcuding Doornfontein from 1996 onwards) gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The mine was one of the earliest large scale operations to be developed on the Witwatersrand. First production was in 1942 and large scale commercial ceased in August 2013 when the mine went into provisional liquidation. The mine was operated by typically labour intensive underground methods common to most South African mines. The plant had a peak capacity of 4.3Mt/a. In the later years of the mine as underground production fell mill feed was augmented with feed from dump tailings.

What's included

This report contains

  • Document

    Blyvooruitzicht (inlcuding Doornfontein from 1996 onwards) gold mine

    XLS 136.50 KB

  • Document

    Blyvooruitzicht (inlcuding Doornfontein from 1996 onwards) gold mine

    PDF 428.93 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898