Asset report

Borborema gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Borborema Project is to be mined by conventional open pit method and treated in a 2Mtpa ball mill followed by a gravity separation step and carbon in leach (CIL) plant for Stage 1. Stage 1 will focus on exploiting the upper lenses of mineralisation and adapting to existing transportation and energy infrastructure. Deeper lenses will be developed in Stage 2.

What's included

This report contains

  • Document

    Borborema Project gold mine

    XLS 121.50 KB

  • Document

    Borborema gold mine project

    PDF 526.09 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Reserves and resources
  • Geology
  • Operations
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 4 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898