Asset Report
Borborema gold mine project
Report summary
Borborema Project is to be mined by conventional open pit method and treated in a 2Mtpa ball mill, followed by gravity separation and a carbon-in-leach (CIL) plant. Mining will focus on the upper lenses of deposit at an average strip ratio of 3.5. Approximately 50% of the ore from the deposit will remain accessible for any future expansions. The property is located in Serido in the State of Paraiba, Brazil. It comprises 3 mining licenses which cover 29km2.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
- Royalties & Taxes
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
06 December 2022
Rainy River gold mine project
Asset Report
Rainy River gold mine project
A detailed analysis of the Rainy River gold mine project.
$2,25012 December 2022
Huayue Nickel Cobalt HPAL nickel operation
Asset Report
Huayue Nickel Cobalt HPAL nickel operation
A detailed analysis of Huayue Nickel and Cobalt HPAL nickel operation
$2,25029 September 2022
Salares Norte gold mine project
Asset Report
Salares Norte gold mine project
A detailed analysis of the Salares Norte gold mine project
$2,250