Asset Report
Borborema gold mine project
Report summary
Borborema Project is to be mined by conventional open pit method and treated in a 2Mtpa ball mill, followed by gravity separation and a carbon-in-leach (CIL) plant. Mining will focus on the upper lenses of deposit at an average strip ratio of 3.5. Approximately 50% of the ore from the deposit will remain accessible for any future expansions. The property is located in Serido in the State of Paraiba, Brazil. It comprises 3 mining licenses which cover 29km2.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
- Royalties & Taxes
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Wasamac gold mine project
A detailed analysis of the Wasamac gold mine project.
$2,250
Asset Report
Golpu gold mine project
A detailed analysis of the Golpu gold mine project.
$2,250
Asset Report
NuevaUnion gold mine project
A detailed analysis of the NuevaUnion gold mine project.
$2,250