Asset report

Boyongan copper mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Philex refers to the Boyongan and the Bayugo deposits as the Silangan project. This is a porphyry copper deposit. The oxide ore is to be processed via sulphuric leaching whilst the sulphide is to be processed by conventional flotation techniques. A gold doré is also to be produced via gravity separation. The pre feasibility study was completed by July 2014. In 2015 the company was in the process of evaluating potential partners and assessing market conditions for fund raising. A the same time the feasibility study was expected to be completed by the end of 2015 and production was expected by 2018. Wood Mackenzie takes a conservative view an assumes a start up date by 2019.

What's included

This report contains

  • Document

    Boyongan copper mine project

    PDF 580.21 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 5 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Costs: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898