Asset report

Briggs gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Briggs was a conventional open pit operation with ore treated via heap leaching. Mining and leaching ceased in July 2015 due to uneconomic reason. Residual leaching is expected to continue up to 2017 at least.

What's included

This report contains

  • Document

    Briggs gold mine

    XLS 136.00 KB

  • Document

    Briggs gold mine

    PDF 669.15 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Infrastructure
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898