Asset report

Brucejack gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Brucejack project comprises six mineral claims across 3 200ha located in the Sulphurets District of the iskut River Region 950km northwest of Vancouver and 65km north of the Town of Stewart north western British Columbia. Underground mining is planned with ore processing by bulk sulphide flotation and gravity concentration. Average annual gold production is estimated at 404koz/a over an 18 year mine life (504koz/a for the first 8 years). Construction is on going and commercial production is expected to commence in 2017.

What's included

This report contains

  • Document

    Brucejack Project gold mine

    XLS 134.00 KB

  • Document

    Brucejack gold mine project

    PDF 852.77 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Production
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898