Asset report

Canadian Malartic gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The property is owned and operated by the Canadian Malartic partnership a 50:50 joint venture (JV) between Yamana Gold and Agnico Eagle. The mine is a conventional truck and shovel open pit operation with ore treatment in a 2.2Mt/a agitated leach plant to produce a gold silver dore.The mine was developed and commissioned by Osisko Mining in 2011 at initial capital costs of US$1.1 billion. At an average gold production rate of over 600koz/a Malartic is set to be Canada's largest gold mine. In 2016 the mine produced 585koz of gold and 680koz of silver.

What's included

This report contains

  • Document

    Canadian Malartic gold mine

    PDF 473.96 KB

  • Document

    Canadian Malartic gold mine

    XLS 122.00 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898