Asset report

Canadian Malartic gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The property is owned and operated by the Canadian Malartic partnership, a 50:50 joint venture (JV) between Yamana Gold and Agnico Eagle. The mine is a conventional truck and shovel open pit operation with ore treatment in a 2.2Mt/a agitated leach plant to produce a gold-silver dore.The mine was developed and commissioned by Osisko Mining in 2011 at initial capital costs of US$1.1 billion. At an average gold production rate of over 600koz/a, Malartic is set to be Canada's largest gold mine. In 2016, the mine produced 585koz of gold and 680koz of silver.

What's included

This report contains

  • Document

    Canadian Malartic gold mine

    PDF 473.96 KB

  • Document

    Canadian Malartic gold mine

    XLS 122.00 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898