Asset report

Carapateena gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Carrapateena is a greenfield iron oxide copper gold (IOCG) project in South Australia approximately 250 kilometres south east of the Prominent Hill mine. A 4Mt/a sub level caving operation has been proposed with on site processing by crushing grinding and flotation to produce a copper gold concentrate with silver credits.

What's included

This report contains

  • Document

    Carapateena gold mine project

    XLS 119.00 KB

  • Document

    Carapateena gold mine project

    PDF 513.33 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898