Asset report

Carrapateena copper mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Carrapateena is a greenfield iron oxide copper gold (IOCG) project in South Australia approximately 250 kilometres south east of OZ Minerals' Prominent Hill mine. An underground sub level caving operation has been proposed with onsite processing by crushing grinding and flotation to produce a copper gold concentrate with silver credits. The project also includes a centralised Concentrate Treatment Plant (CTP) to be built in Whyalla capable of upgrading concentrate grade to 60% copper. Total pre production capital costs has been estimated at A$975 million.

What's included

This report contains

  • Document

    Carrapateena copper mine project

    XLS 521.00 KB

  • Document

    Carrapateena copper mine project

    PDF 517.20 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Costs
  • Infrastructure
  • Operations
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898